Company dynamics

  • Our two cranes with a maximum lifting capacity of 360 tons have arrived.

    Our two cranes with a maximum lifting capacity of 360 tons have arrived at the company.

    2021-11-07 read:261

  • How to choose a removal company?

    When choosing a professional handling company, you can focus on the following two aspects.

    2021-11-07 read:214

  • What can cranes do?

    The uses of cranes: Install billboards Install street lights Landscaping hoisting, transport, pruning Lifting and transporting the containers Site transfer equipment, hoisting, etc

    2021-11-07 read:324

  • What matters should we focus in the process of construction?

    1, Do the inspection and maintenance before the operation. Before the crane operation, the vehicle shall be inspected and prepared according to the operation instructions, then start the engine, check various instruments under neutral conditions, check whether there are overhead power lines or obstacles within the operation scope, and before the operation preparation is confirmed.

    2021-11-07 read:213

  • How to charge a crane?

    First of all, the charging standard of the crane is generally by time or day or monthly. Monthly charges will be much cheaper than daily charged.

    2021-11-07 read:286

  • Our two cranes with a maximum lifting capacity of 360 tons have arrived.

    Our two cranes with a maximum lifting capacity of 360 tons have arrived at the company.

    2021-11-07 read:261

  • How to choose a removal company?

    When choosing a professional handling company, you can focus on the following two aspects.

    2021-11-07 read:214

  • What can cranes do?

    The uses of cranes: Install billboards Install street lights Landscaping hoisting, transport, pruning Lifting and transporting the containers Site transfer equipment, hoisting, etc

    2021-11-07 read:324

  • What matters should we focus in the process of construction?

    1, Do the inspection and maintenance before the operation. Before the crane operation, the vehicle shall be inspected and prepared according to the operation instructions, then start the engine, check various instruments under neutral conditions, check whether there are overhead power lines or obstacles within the operation scope, and before the operation preparation is confirmed.

    2021-11-07 read:213

  • How to charge a crane?

    First of all, the charging standard of the crane is generally by time or day or monthly. Monthly charges will be much cheaper than daily charged.

    2021-11-07 read:286