Technical knowledge

  • Case of equipment lifting in place scheme

    To ensure the safety of the generator stator, we plan to adopt the manual horizontal passage method according to the site situation.

    2021-11-07 read:203

  • How to carry factory equipment safely?

    1.Select a regular handling company. 2.Handling according to the rules and regulations.

    2021-11-07 read:190

  • Equipment handling and construction safety measures

    The person in charge of the equipment handling project must carry out lifting and handling technology disclosure and safety construction education to all the construction personnel, and record the work well.

    2021-11-07 read:178

  • Requirements for equipment packaging during mechanical equipment relocation

    1.Dust proof requirements. 2.Anti rust requirements. 3.Requirements for stamping resistance. 4.Requirements Conducive to shipment.

    2021-11-07 read:151

  • Notes During the Construction Process

    1, Do the inspection and maintenance before the operation. Before the crane operation, the vehicle shall be inspected and prepared according to the operation instructions, then start the engine, check various instruments under neutral conditions, check whether there are overhead power lines or obstacles within the operation scope, and before the operation preparation is confirmed.

    2021-11-07 read:244

  • Case of equipment lifting in place scheme

    To ensure the safety of the generator stator, we plan to adopt the manual horizontal passage method according to the site situation.

    2021-11-07 read:203

  • How to carry factory equipment safely?

    1.Select a regular handling company. 2.Handling according to the rules and regulations.

    2021-11-07 read:190

  • Equipment handling and construction safety measures

    The person in charge of the equipment handling project must carry out lifting and handling technology disclosure and safety construction education to all the construction personnel, and record the work well.

    2021-11-07 read:178

  • Requirements for equipment packaging during mechanical equipment relocation

    1.Dust proof requirements. 2.Anti rust requirements. 3.Requirements for stamping resistance. 4.Requirements Conducive to shipment.

    2021-11-07 read:151

  • Notes During the Construction Process

    1, Do the inspection and maintenance before the operation. Before the crane operation, the vehicle shall be inspected and prepared according to the operation instructions, then start the engine, check various instruments under neutral conditions, check whether there are overhead power lines or obstacles within the operation scope, and before the operation preparation is confirmed.

    2021-11-07 read:244